Hatfield Tunnel Powered Access


Brief:
- Client required us to provide machines and service that could support the £50m refurbishment of a major UK tunnel.
- Working at height took place next to the A1 road.
- Fluid spillage from machines was not acceptable.
- 24/7 operation.
- Previous powered access supplier removed after very poor Health and Safety performance.
Location: Hatfield Tunnel, Hatfield.
Client: Balfour Beatty.
Our Response:
- We conducted a survey of the site
- 24/7 service level was agreed
- Engineer attended site twice per week
- Programme of Tool Box Talks and IPAF Training