Hatfield Tunnel Powered Access

Released 24th Mar, 2011

Print Send to a friend or colleague

Forward to a friend

To forward details of the current page to a friend or colleague please complete the form below.

Recipients Email

Recipients Name

Your Name

Introductory Message (optional) help

CAPTCHA verification

Please enter the code shown in the image in the box below.

CAPTCHA

Please try another code if you can't read the letters and numbers.

Forward to a friend

An email has been sent to your friend with the details of the current page.


Hatfield Tunnel Health and SafetyHatfield Tunnel Scissor Lifts

Brief:

  • Client required us to provide machines and service that could support the £50m refurbishment of a major UK tunnel.
  • Working at height took place next to the A1 road.
  • Fluid spillage from machines was not acceptable.
  • 24/7 operation.
  • Previous powered access supplier removed after very poor Health and Safety performance.

Location: Hatfield Tunnel, Hatfield.

Client: Balfour Beatty.

Our Response:

  • We conducted a survey of the site
  • 24/7 service level was agreed
  • Engineer attended site twice per week
  • Programme of Tool Box Talks and IPAF Training