Case Studies

Nationwide platforms offers excellence at the highest levels, these case studies have been selected to give you an insight into how we have offered working at height solutions.

Displaying 1 to 7 of 7 results

Hatfield Tunnel Powered Access

Hatfield Tunnel Powered Access
Access platform equipment used for tunnel refurbishment. Hire powered access equipment for working at height projects.
View the Full Case Study

Wolverhampton Total Powered Access Solution

Wolverhampton Total Powered Access Solution
Providing safe ways of working at height and total powered access solutions for UK.
View the Full Case Study

Project Sun

Project Sun
Provide Material Handling systems to install materials at over 38m for one of the tallest warehouses in the UK. Education of Working at Height Best Practice to site operatives.
View the Full Case Study

British Open Golf Championship 2009, 2010, 2011

British Open Golf Championship 2009, 2010, 2011
Provide specialist truck mounts with tailor made camera cages and camera pods for coverage of live events.
View the Full Case Study

Glasgow Commonwealth Games 2014

Glasgow Commonwealth Games 2014
Powered Access equipment solution provided for the installation of the 2.5 metre wide ducting at 22 metres height within confined working areas.
View the Full Case Study

Harry Potter and Powered Access Management

Harry Potter and Powered Access Management
Bespoke powered access management project for 18 months and providing specialist truck mounts with tailor made lighting frame.
View the Full Case Study

Hope Hospital, Manchester

Hope Hospital, Manchester
New Low Level Access products used instead of mobile towers for a Maintenance & Engineering contract at Hope hospital
View the Full Case Study
Displaying 1 to 7 of 7 results